24 hour emergency call-out for storm damage and active leaks

Call us on 0330 223 7665

Costs and quotes

What does a new roof actually cost, and what moves the price?

Nobody can give you an accurate roof price over the phone, but everybody wants a number. Here is what the number is actually made of, so you can judge whether a quote is fair.

The four things that decide the price

Roof area, not house size

A roof has more surface than the floor beneath it, and a complicated roof has considerably more. A simple gable roof is roughly 1.3 times its footprint. A hipped roof, with slopes on all four sides, is nearer 1.45. Add valleys, dormers and a few changes of direction and you are at 1.65 or more — plus a great deal of cutting, which is labour.

This is why two houses with the same floor area can have quite different roof prices.

What you cover it with

Supplied and fitted, roughly in order: concrete interlocking tiles are the most economical, then fibre cement slate, then clay pantiles, then clay plain tiles, with natural slate and standing seam metal at the top. Natural slate can be two to three times the rate of concrete tile per square metre.

Weight matters too. Slate is lighter than concrete tile, so going from slate to tile adds load the original structure was not designed for. Sometimes that means strengthening, which is a cost nobody mentions at the quotation stage unless they have looked properly.

Access

This surprises people more than anything else. On a terrace with no vehicle route to the back, scaffolding can cost more than the tiles. A three-storey house needs more of it than a bungalow. A conservatory in the way means a bridge over it.

It is also the reason doing several jobs in one visit is so much cheaper than doing them separately. Scaffolding goes up once.

What is under the old roof

This is the honest unknown. Until the covering comes off, nobody knows whether the rafter feet have rotted where a gutter has been overflowing for fifteen years, or whether there are two layers of covering up there, or what state the wall plate is in.

A good quote handles this with a stated timber allowance — a sum included for a reasonable amount of repair, with a rate for anything beyond it. A quote that says nothing about it is either optimistic or planning to have a conversation on day three.

How to compare two quotations

Line by line, not bottom line to bottom line. Check each quote includes:

  • Scaffolding, and to which elevations. A quote that excludes it is not comparable with one that includes it.
  • Strip and disposal of the old covering, including skips or grab hire.
  • A timber allowance, with a stated rate for anything beyond it.
  • New membrane and battens throughout — not reusing the old battens.
  • How the ridges and verges are fixed: mortar or a mechanically fixed dry system. There is a real cost difference and a real performance difference.
  • New lead to chimneys, abutments and valleys, with the code stated.
  • Ventilation, at the eaves and ridge.
  • Whether guttering is included or is a separate price.
  • VAT, and whether it is in the figure shown.
  • The guarantee, in writing, with a length on it.

If one quote is substantially cheaper, it is usually one of those lines missing rather than a better price on the same work.

Where the cheap quotes come from

Not always dishonesty — sometimes just a different specification. But the common ones are: no scaffolding, reusing the old battens, mortar-bedded ridges priced as a thin point-over rather than a proper rebed, no timber allowance, and no membrane.

The other one is a day-rate job with no written scope at all, which is how a four-figure job becomes a five-figure one.

Do you actually need a new roof?

Often not. A roof needs replacing when the covering itself has broken down — tiles going soft or shedding their surface, slates delaminating, nails corroded throughout. Loose ridge mortar, a cracked valley and a few slipped tiles are maintenance, and doing those three things costs a small fraction of a replacement.

If you have been told you need a new roof and the reasons given were loose ridges or moss, get a second opinion before you spend the money.

Getting a number before anyone comes out

Our roof replacement cost calculator will put you in the right range in about a minute. It works from typical footprints and current rates, and the page is honest about what it cannot know — which is mostly the condition of your timbers and the detail of your access.

Use it to decide whether to have the conversation. Then have someone come and look, which costs nothing.

Questions people ask us

Can you give me a price over the phone?

For some things, roughly — a garage roof, gutter cleaning, a loft ladder. For a full roof, a phone price would be a guess, and a guess helps nobody. The site visit is free.

Why is scaffolding such a big part of the cost?

Because it is a separate trade with its own hire period, and on a terrace with no rear access it has to go up at the front with materials carried through. It is also not optional for safe work at height.

Is a cheaper quote always worse?

Not always, but it is usually a different specification rather than a better price. Compare the lines rather than the totals — scaffolding, battens, membrane, how the ridges are fixed and whether there is a timber allowance.

More from the blog

All articles