Loft conversions: the roofing side, done right

A loft conversion is the best value extra room most houses can get: the space is already there and it is already covered. The roofing work is the part that decides whether the room is warm, dry and signed off, and that is the part we do.

Call 0330 223 7665 Get a free quote

What we do, and what we do not

To be straight with you: a loft conversion involves structural engineering, floor joists, stairs, electrics, plumbing, plastering and building control sign-off. We are roofers. What we do is the roof side of it, and we do that part properly:

  • Forming and weatherproofing dormers
  • Roof windows, including the escape-sized units building control will want
  • Insulating the roof slope to current U-values
  • Re-covering, re-membraning and re-battening where the roof has to come off
  • All the leadwork, flashings and junctions
  • Designing in the ventilation the new room needs
  • Guttering, fascias and roofline alterations that the new shape needs

For the rest — the steels, the floor, the staircase, the first fix and the finishes — you need a builder, and we are happy to work alongside one or to recommend people we have worked with. What we will not do is pretend a roofing firm can deliver a complete conversion on its own.

Dormer or roof window?

The first real decision, and it changes the cost substantially:

  • Roof windows only — much cheaper, no planning permission in most cases, and keeps the roofline as it is. You live with the existing head height and the sloping ceilings
  • A rear dormer — a box built out from the roof slope, giving full head height and a vertical window. Far more usable floor area. The usual choice
  • A hip-to-gable — the sloped hip end rebuilt as a vertical gable, which adds a lot of volume on a semi or detached house. Often combined with a rear dormer
  • A mansard — the whole rear slope rebuilt steeply. The most space and the most money, and usually needs permission

A straightforward rear dormer on a terrace or semi is usually permitted development, within limits on volume, position and materials. A dormer on the front elevation almost always needs planning permission. We will tell you which yours is before you spend money on drawings.

Insulation: warm roof or cold roof

This is the technical decision that matters most for whether the room is comfortable, and it affects your head height.

A cold roof keeps a ventilated gap between the insulation and the underside of the roof covering. It needs 50mm of clear airway above the insulation, which eats into your ceiling height, but it is well proven and more forgiving of imperfect detailing.

A warm roof puts the insulation above or in line with the rafters with no ventilated gap, relying on a continuous vapour control layer on the warm side to keep moisture out of the structure. It gives more head height for the same performance, and it is less forgiving — a gap in the vapour control layer means interstitial condensation inside the roof where nobody can see it.

Either can be right. What matters is that it is detailed properly and that the vapour control layer is genuinely continuous, which means sealing round every roof window, every downlight and every service penetration. That is where conversions go wrong, and it is invisible once it is plastered.

Building regulations

A conversion needs building control approval whether or not it needs planning permission, and the roofing side has to satisfy several parts of it:

  • Part L — insulation and U-values for the roof, walls and windows
  • Part B — fire safety, escape windows of a minimum size and position, and protected routes
  • Part C — resistance to moisture, which is where the vapour control layer and ventilation come in
  • Part K — stairs, which is the builder's side but affects where the dormer goes
  • Part F — ventilation of the new room
  • Structural approval for anything cut or added in the roof

We set the roofing work out to meet those requirements and we are used to inspectors looking at it. The specification is in the quotation rather than worked out on site.

A realistic order of work

Roughly how a conversion runs, and where we come in:

  • Structural engineer's calculations and drawings; planning if needed; building control application
  • Steels and new floor joists in, so the floor can take the load
  • Dormer formed, roof opened up, windows in — our work, and the point at which the loft becomes weathertight as a room
  • Insulation and vapour control layer, inspected by building control before it is covered
  • First fix electrics and plumbing, stud walls
  • Plasterboard, plaster and the staircase
  • Second fix, decoration, flooring
  • Final inspection and completion certificate

Our part is usually two spells: the dormer and weatherproofing early, then back at the end for the roofline and any making good.

What is included

  • Dormer construction, weatherproofing and cladding
  • Roof windows, including escape-sized units
  • Insulation to current regulations, warm or cold roof
  • Breathable membrane, battens and re-covering as needed
  • New lead flashings at every abutment
  • Ventilation designed in so the new room does not condense
  • Work set out to satisfy building control

Loft conversions: your questions answered

Do you do complete loft conversions?

We do the roofing side — dormers, windows, insulation, weatherproofing and all the leadwork — and we work alongside a builder for the structure, stairs and finishes. We would rather be straight about that than take on work outside what we are good at.

Do I need planning permission for a loft conversion?

A rear dormer is usually permitted development within limits on size, position and materials. A front dormer almost always needs permission, as does anything on a listed building or in a conservation area. Building control approval is needed either way.

How much head height do I need?

As a rule of thumb you want around 2.2 to 2.4 metres from the existing ceiling joists to the underside of the ridge before a conversion is comfortable. Less than about 2 metres and a dormer or a mansard becomes necessary rather than optional.

Warm roof or cold roof?

Warm roof gives you more head height; cold roof is more forgiving of imperfect detailing. Both work when they are done properly. The detail that matters either way is a genuinely continuous vapour control layer.

Can you just fit the roof windows and let me do the rest?

Yes. Plenty of people start with windows and insulation and do the internal work themselves or later. We will tell you what the roofing side needs to look like to satisfy building control when you do get it signed off.

Get a price for loft conversions

Fill this in and we will get back to you. If it is urgent, calling is quicker — 0330 223 7665.

We reply to enquiries during opening hours. No marketing lists, ever.

From our blog

All articles

Need a roofer you can rely on?

Tell us what the roof is doing and we will come out, take a proper look and put a written price in front of you. No call-out charge, and the quote is free.